Nevada energy and the grid: what’s moving toward 2027

How electric rates and resource plans are decided in Nevada, the renewable portfolio standard, Greenlink and other transmission, service to large new loads, the Governor’s Office of Energy, and the energy bill draft requests filed for the 84th Session. Every fact links to its primary source.

  • 15Bill draft requests on the 2027 list that touch energy or utilities, apart from the three on data centers, as of November 21, 20265
  • Dec 31, 2026Executive order deadline for a statewide “Responsible Speed to Power Plan”6
  • 42%Renewable portfolio standard for 2027 through 2029, up from 34 percent1
  • Feb 1, 2027The 84th Session convenes10

What’s at stake in Nevada

Electric rates and resource plans in Nevada are decided by the Public Utilities Commission of Nevada (PUCN) under NRS Chapter 704.1 NV Energy comes before the PUCN as two utilities, Nevada Power Company and Sierra Pacific Power Company, often in joint filings.3 Each electric utility must file a general rate application at least once every 36 months, and the PUCN generally has 300 days to rule on an electric utility’s application to change its rates. The cost of purchased fuel and power is tracked separately, in deferred accounts that the utility asks to adjust in its own filings.1

Planning runs on a three-year cycle. By June 1 of every third year, or more often if necessary, an electric utility files a plan to increase its supply of electricity or decrease demand, the integrated resource plan; affiliated utilities with an interconnected transmission system file one joint plan. The PUCN must accept or modify the energy supply portion within 135 days and the rest within 210 days. Most new generating plants, and transmission lines of 200 kilovolts or more built outside incorporated cities, also need a permit from the PUCN under the Utility Environmental Protection Act before construction starts; renewable plants of 70 megawatts or less are excluded.1

Nevada adopted its renewable portfolio standard in 1997.8 The standard requires each provider of electric service to generate or acquire a share of its retail sales from renewable sources: at least 34 percent for 2024 through 2026, 42 percent for 2027 through 2029, and 50 percent from 2030 on. Since 2025, energy efficiency savings no longer count toward it. State policy also sets a goal of producing, by 2050, as much energy from zero-carbon resources as providers sell in Nevada.1

On the executive side, the Office of Energy sits within the Office of the Governor, and its Director is appointed by and serves at the pleasure of the Governor.2 Executive Order 2023-007 set the state’s energy policy objectives, including affordable rates, in-state generation, new transmission and storage, and permit review run concurrently rather than one after another; it stays in effect through December 31, 2033.7 The Office also runs the Renewable Energy Tax Abatement program, which grants partial sales and use tax and property tax abatements to eligible renewable energy facilities.9

What’s moving toward the 2027 session

Bill draft requests

As of November 21, 2026, the 84th Session list holds 636 bill draft requests. By our reading of their summaries, 15 touch energy or utilities, apart from the three that name data centers:5

  • From individual legislators. BDRs 58-31, 270, 58-278 and 324 each read “Revises provisions relating to energy.” BDR 40-119 concerns recycling critical materials for clean energy production; BDR 58-595 “Authorizes certain electric utilities to create a joint action agency”; BDR 608 concerns the aggregation of distributed energy resources in virtual power plants; and BDRs 619 and 620 concern solar energy and solar energy facilities.5
  • From interim committees. BDR 58-432, from the Joint Interim Standing Committee on Growth and Infrastructure, concerns energy assistance programs. BDR 498, from the Joint Interim Standing Committee on Government Affairs, concerns the PUCN’s public hearing process. BDR 32-475, from the Committee on Public Lands, concerns the taxation of solar panels.5
  • From the Attorney General. BDRs 58-536 and 58-549 each “Revises provisions relating to public utilities,” and BDR 58-546 “Establishes provisions relating to consumers of large amounts of energy.”5

None of the 15 has a bill number or bill text yet.5 We’ll summarize each one here when it is prefiled or introduced. The data center requests are covered on our data centers page.

Resource plan and rates at the PUCN

  • Integrated Resource Plan. Docket 26-05007 is NV Energy’s joint 2027–2046 Triennial Integrated Resource Plan and 2027–2029 Energy Supply Plan, filed May 7, 2026.3 The PUCN calendar shows hearings in the docket October 26–29 and November 16–17, 2026.4
  • General rates. Nevada Power’s most recent general rate application on the docket list is Docket 25-02016, filed February 18, 2025.3 The PUCN calendar shows a workshop in that docket on December 15, 2026.4 Sierra Pacific’s most recent electric general rate application on the list is Docket 24-02026, filed February 23, 2024.3
  • Fuel and purchased power. On November 13 and 16, 2026, the two utilities filed notices to adjust their Base Tariff Energy Rates and Deferred Energy Account Adjustment Rates effective January 1, 2027: Dockets 26-11012 (Nevada Power) and 26-11013 and 26-11014 (Sierra Pacific).3
  • Affordability. Docket 26-04024, opened April 16, 2026, is an investigation of existing programs that provide energy assistance to Nevada electric ratepayers.3 The PUCN calendar shows a workshop on December 9 and comments due December 21, 2026.4
  • Renewable compliance. NV Energy’s annual report on compliance with the portfolio standard for 2025 is Docket 26-04023, filed April 15, 2026.3

Large new loads

  • Service agreements. In May and June 2026, NV Energy’s two utilities filed five applications for approval of Large Load Electric Service Agreements, Dockets 26-05026 through 26-05030.3 The data center side of these filings is on our data centers page.
  • Tariff filings for large customers. In May 2024 both utilities applied to add a Clean Transition Tariff, “to allow eligible customers to receive bundled electric service from new clean energy resources” (Dockets 24-05022 and 24-05023). In March 2026 both applied to update contract demand under their Large Standby Service Rider (Dockets 26-03007 and 26-03008).3
  • Investigation request. Executive Order 2026-005 directs the Director of the Office of Energy to ask the PUCN to consider opening an investigatory docket on large load service, cost recovery and its timing, flexible service, co-located generation, and service during a declared grid emergency.6
  • Speed to Power Plan. The same order requires the Director, with GOED’s Executive Director and each electric utility and in consultation with large load customers, to deliver a Responsible Speed to Power Plan to the Governor by December 31, 2026, identifying the facilities required to serve the large load anticipated through 2036.6

Transmission: Greenlink and beyond

  • Greenlink West. NV Energy’s 2020 permit application under the Utility Environmental Protection Act, Docket 20-07025, describes new Fort Churchill–Northwest and Harry Allen–Northwest 525 kV lines and new Amargosa and Esmeralda collector substations in Clark, Nye, Esmeralda, Mineral and Lyon counties. Later applications cover the Walker River Substation in Lyon County (Docket 24-01020, January 2024) and three 345 kV lines in Lyon, Storey and Washoe counties (Dockets 26-04010 and 26-04011, April 2026).3
  • Greenlink North. Docket 20-07024 is the permit application for two 525 kV lines, a new Lander Substation and an expanded Robinson Summit Substation in White Pine, Eureka, Lander, Churchill and Lyon counties.3
  • Benefits reporting. NV Energy files an annual Greenlink Benefits Report under the PUCN’s order in Docket 20-07023, the fourth amendment to its 2018 resource plan, which updated the Transmission Action Plan. The latest is Docket 26-02025, filed February 26, 2026.3
  • Other lines. 2026 filings include Sierra Pacific’s notice for the Chukar to Lantern 345 kV line in Churchill, Lyon, Storey and Washoe counties (Docket 26-04032) and a private developer’s notice for the 143.9-mile Dixie Valley 345 kV project across five northern Nevada counties (Docket 26-11009).3

Key dates

  • December 9, 2026, 10 a.m. PUCN workshop in the energy assistance investigation, Docket 26-04024.4
  • December 10, 2026. Legislators’ second-round bill draft deadline.11 See the 2027 session guide.
  • December 15, 2026, 11 a.m. PUCN workshop in Nevada Power’s general rate docket, 25-02016.4
  • December 31, 2026. The Responsible Speed to Power Plan is due to the Governor.6
  • January 1, 2027. The portfolio standard rises to 42 percent,1 and the utilities’ noticed Base Tariff Energy and Deferred Energy rate adjustments carry this effective date.3
  • January 30, 2027. The Office of Energy’s report on the status of energy in Nevada is due to the Legislative Counsel Bureau for the 2027 session.2
  • February 1, 2027. The 84th Session convenes.10
  • 2030. The portfolio standard reaches 50 percent.1

PUCN events may be continued, rescheduled or cancelled by the presiding officer. The Legislature has not yet published its 2027 deadline calendar. We’ll add hearing and deadline dates here as they post.

How we help

We track the energy requests and bills, the PUCN resource plan, rate and large-load dockets, and the Office of Energy’s work, and tell clients what each change means for a project, a site, a service agreement or a power bill. We prepare testimony and amendments, brief local governments and community stakeholders, and coordinate with the client’s energy and regulatory counsel.

Session updates

  1. Page published. As of today, 15 of the 636 bill draft requests for 2027 touch energy or utilities apart from the data center requests, and none has bill text posted.5 NV Energy’s 2027–2046 resource plan, Docket 26-05007, had hearings on November 16 and 17.4

Sources

All read on November 21, 2026.

  1. NRS Chapter 704: NRS 704.110 (general rate applications), 704.187 (deferred accounting), 704.741 and 704.751 (resource plans), 704.7820 and 704.7821 (portfolio standard), 704.865 (Utility Environmental Protection Act permits): leg.state.nv.us/NRS/NRS-704.html
  2. NRS Chapter 701, NRS 701.150 and 701.160 (Office of Energy; status of energy report): leg.state.nv.us/NRS/NRS-701.html
  3. Public Utilities Commission of Nevada, docket information (all dockets): pucweb1.state.nv.us/puc2/Dktinfo.aspx
  4. Public Utilities Commission of Nevada, calendar (October through December 2026): pucweb1.state.nv.us/puc2/PUCCalendar.aspx
  5. NELIS, 84th (2027) Session bill draft request list: leg.state.nv.us/App/NELIS/REL/84th2027/Bdrs/List
  6. Executive Order 2026-005, Order Establishing the Nevada Standard for Responsible Data Center Development (September 17, 2026), Section 5: gov.nv.gov (PDF)
  7. Executive Order 2023-007, Order Establishing the State of Nevada Energy Policies Objectives (March 21, 2023): gov.nv.gov
  8. Governor’s Office of Energy, Renewable Portfolio Standard Reporting: energy.nv.gov/resources/renewable-portfolio-standard-reporting
  9. Governor’s Office of Energy, Renewable Energy Tax Abatement (RETA) Program: energy.nv.gov/programs/renewable-energy-tax-abatement-reta-program
  10. NELIS, 84th (2027) Session: leg.state.nv.us/App/NELIS/REL/84th2027
  11. NRS Chapter 218D, NRS 218D.150: leg.state.nv.us/NRS/NRS-218D.html

This page explains; it takes no position on any pending bill, application or docket. It is general information, not legal advice. Last reviewed November 21, 2026.

Actively onboarding and accepting clients for Nevada’s 2027 Legislative Session.

Have an issue in front of Nevada government?

The 84th Session of the Nevada Legislature convenes February 1, 2027. Talk with us before it does.